DEVELOPER INCENTIVES

Corporate Renewable Energy Supply Scheme (CRESS)

You can become a Renewable Energy Developer (RED) under the CRESS scheme if you develop and own a Green Energy Plant (GEP) with a capacity of at least 30 MW. This plant must be directly connected to the national Grid System (132kV and above) and supply green electricity to high or medium voltage corporate consumers through physical power purchase agreements via open access.